By building the sidewalk bridge over Nassau Street, the demolition contractor was able to provide protection for vehicles and pedestrians on both sides of the street. The large platform also provided a staging site for removal of debris that had been lowered by derrick from the roof. Short term storage of debris on the sidewalk bridge probably allowed flexible scheduling of the trucks hauling debris to the constricted site. |