![]() |
|
|
||||
The eighth floor has been draped with tarpaulins to help retain heat. Concrete poured during winter needs to be protected from freezing if it is to achieve its full strength. Another derrick has been erected at the sixth Floor to allow movement of materials up the outside face of the building. |