|
|
|
||||
The steel frame has been raised to the ground floor level and planked to provide a temporary work platform. The main erection derrick has been placed so that steel members arriving by truck or cart can be picked from both Wall and Nassau Streets. The platform over Nassau Street has been removed. Materials are stored in the street and over what appears to be a sidewalk vault east of the new building. |