The "Erection Views of Empire State Building" is a hand-bound photograph album featuring a rich collection of original construction
images, organized and compiled by the general contractors of the Empire State Building, Starrett Brothers & Eken, Inc. from
1929 to 1931.
In 2001, Karl Dudley "Hobey" Pierson, the grandson of Paul Starrett (1866-1957), one of the two brothers of Starrett Brothers
& Eken, Inc. contacted The Skyscraper Museum about the photograph album when he came across the publication Building the Empire State (NY: W.W. Norton, 1998). The book reproduces a notebook compiled between approximately 1929 and 1931 by Starrett Brothers
& Eken, Inc., which is part of the Museum's archive. This document, titled "Notes on Construction of Empire State Building,"
is a manuscript of 77 numbered sheets of typed text on notebook-sized graph paper and is part of the Records of HRH Construction
(accession no. 1997.02). Interspersed throughout the notebook are 33 sheets of brown pressboard on which are mounted 70 black
and white photographs, developed from the same negatives as some of the photographs found in the photograph album. A finding
aid for this collection is available online on "VIVA History: Visual Index to the Virtual Archives of The Skyscraper Museum"
website.
The collection of 511 photographs compiled in the 94-page album document virtually every step of the construction of the Empire
State Building, from the demolition of the original Waldorf-Astoria Hotel to the topping off ceremony of the mooring mast.
It features many detailed mini-series of the myriad processes that were required of early 20th century skyscraper construction.
Images featuring bricklaying, riveting, the setting of the limestone façade, among others, along with numerous candid photographs
of construction workers on the job, relaxing at lunch, receiving paychecks, etc., as well as construction managers and such
dignitaries as the famous Directors of the Empire State Company, including the former Governor of New York, Alfred E. Smith,
at official ceremonies. In many ways the collection adopts the format characteristic of a handmade scrapbook, as if the Empire
State Building itself was recounting the story of its creation, while also keeping the charm of a family album. This unique
volume affords insights into both the technical aspects of the construction and the human face of the army of workers and
managers that created New York's signature skyscraper.
In 2002, the photograph album was donated by Pierson to the Museum's permanent collection. The album and its pages were in
extremely fragile condition and required immediate attention by a conservator prior to any handling. There were brittle pages
with some of them torn at the bottom, and several handwritten captions are incomplete and not fully legible. In 2003, a conservator
was hired to restore the photograph album. The individual photographs in the collection were then removed, assigned a unique
accession number and scanned. The digital images were then captured onto archival CD-ROMs and copied to the Museum archival
computer hard drive. In 2005 the digitized images of the photographs, along with the digitized image of the album intact,
became a centerpiece of the Museum's online archive project VIVA2, as part of its continuing mission to narrate the multifaceted
stories of the design and construction of skyscrapers.
The photograph album is an embossed, leather-faced volume with the words "Erection Views of Empire State Building: Starrett
Brothers and Eken Incorporated" handwritten on the black frontispiece. It measures 11 ¼ x 15 ½ in. and consists of 94 black
mounting paper pages with 511 black and white gelatin silver photographs. It is formatted as a left bound, 2-holed, expandable
leaf album bound with a single 6-ply cord string through a short metal tube and eye studs, which were placed in each hole.
Among the 511 photographs in the album, 507 are secured with photo corners, three to eight on each side of the pages, while
four are loosely filed. Additionally, five photographs were missing prior to the album's arrival to the Museum, evidenced
by captions detailing the photograph's content where the missing photos were once mounted. With the exception of the four
loose items, whose captions are printed typographically below the image, each photograph is captioned with handwritten descriptions
and usually the date and number. The assigned numbers are not sequential and are occasionally left off all together or letters
have taken their place.
Most of the photographs are either 2 ¾ x 4 5/8 in., or 3 7/8 x 4 5/8 in. in size. Three separate pairs of photographs (item
numbers 411-412, 504, and 505 below*) are combined to make one image and are 11 ¼ x 15 ½ in. in size. The four loose items
are 10 ½ x 8 in. in size and are interfiled into the final pages of the album. These are commercial items with the "Publicity
Department" logo, numbers, dates and descriptions printed beneath the image.
NB: The following item descriptions were transcribed directly from the volume in its original order and following original
spelling. Text enclosed in brackets ([ ]) is provided by the Museum staff. Individual page numbers were also assigned by the
Museum staff. The page numbers and the “es” numbers in brackets (e.g. [es0001]) correspond to their digital surrogates for
the scanned page and the photograph.
Open for research without restrictions.
Donated by Karl Dudley Pierson on Feb. 19, 2002.
The arrangement and description of this collection was made possible with the support of a Learning Opportunities Grant from
the Institute of Museum and Library Services, an independent Federal grant-making agency dedicated to creating and sustaining
a nation of learners. The conservation of the photograph album was made possible with the support of the Conservation Treatment
Grant Program administered by the Lower Hudson Conference, a re-granting agency of the Museum Program of the New York State
Council on the Arts.
Inventory
|
|
Page |
Image |
Title |
Date |
1 |
1 |
Waldorf-Astoria Hotel, when wrecking started, Sept. 27th, 1929. A Corner of Fifth Ave. & 33rd St., Waldorf section. 4 ¾ x
3 ⅝ in.
|
1929 |
|
|
|
Page |
Image |
Title |
Date |
1 |
2 |
Waldorf-Astoria Hotel, when wrecking started, Sept. 27th, 1929. B View looking towards Astor Court and 34th St. (Astor Court
building with large chimney in foreground). 4 ¾ x 3 ⅝ in.
|
1929 |
|
|
|
Page |
Image |
Title |
Date |
1 |
3 |
Waldorf-Astoria Hotel, when wrecking started, Sept. 27th, 1929. C Corner Fifth Avenue & 34th St., Astoria section. 4 ¾ x 3
⅝ in.
|
1929 |
|
|
|
Page |
Image |
Title |
Date |
2 |
4 |
Two months after, start of wrecking, Nov. 27th, 1929. D View towards Astor Court & 34th St., Two months after, start of
wrecking, Nov. 27th, 1929. Astor Court building in foreground. 4 ¾ x 3 ¾ in.
|
1929 |
|
|
|
Page |
Image |
Title |
Date |
2 |
5 |
Two months after, start of wrecking, Nov. 27th, 1929. E View Fifth Ave. & 33rd St. 4 ¾ x 3 ⅝ in. |
1929 |
|
|
|
Page |
Image |
Title |
Date |
2 |
6 |
Two months after, start of wrecking, Nov. 27th, 1929. F View Fifth Avenue & 34th St. 4 ¾ x 3 ⅝ in. |
1929 |
|
|
|
Page |
Image |
Title |
Date |
3 |
7 |
Two months after, start of wrecking, Nov. 27th, 1929. G Section of cantilever truss over Grand ballroom, Astoria section.
4 ¾ x 3 ⅝ in.
|
1929 |
|
|
|
Page |
Image |
Title |
Date |
3 |
8 |
Two months after, start of wrecking, Nov. 27th, 1929. H cantilever truss over Grand Ball Room, Astoria section. 4 ¼ x 3 ¾
in.
|
1929 |
|
|
|
Page |
Image |
Title |
Date |
3 |
9 |
Two months after, start of wrecking, Nov. 27th, 1929. J Demolition stage on Jan. 9th, 1930. View 33rd St. and Fifth Ave.
4 ¼ x 3 ¾ in.
|
1929 |
|
|
|
Page |
Image |
Title |
Date |
4 |
10 |
Two months after, start of wrecking, Nov. 27th, 1929. I Ramp used for runway leading to Astor court. 3 ⅝ x 4 ¼ in. |
1929 |
|
|
|
Page |
Image |
Title |
Date |
4 |
11 |
Two months after, start of wrecking, Nov. 27th, 1929. K View from southwest corner. 3 ¾ x 4 ¾ in. |
1929 |
|
|
|
Page |
Image |
Title |
Date |
4 |
12 |
Two months after, start of wrecking, Nov. 27th, 1929. L Excavation work proceeding. 3 ⅝ x 4 ¼ in. |
1929 |
|
|
|
Page |
Image |
Title |
Date |
5 |
13 |
1/21/30, No.1, Demolition-100 ft. derricks. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
5 |
14 |
No. 2, 1/28/30, Demolition and excavating. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
5 |
15 |
No. 3, 1/28/30, Excavating. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
5 |
16 |
No. 6, 2/5/30, Demolition of basements. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
5 |
17 |
No. 13, 3/12/30, Blasting for pipe and ventilating trench. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
5 |
18 |
No. 4, 1/28/30, Demolition & excavation. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
5 |
19 |
No. 5, 2/5/30, Demolition of basements. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
6 |
20 |
No. 8, 2/28/30, Last ramp-driveway to Astor Court. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
6 |
21 |
No. 14, 3/13/30, Blasting for foundations. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
6 |
22 |
No. 11, 3/5/30, Ramp to 34th St. built in two days. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
6 |
23 |
No. 12, 3/5/30, Hauling debris up 34th St. ramp. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
6 |
24 |
No. 18, 3/17/30, View of excavation (pipe and ventilating trench--left). 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
6 |
25 |
No. 9, 2/28/30, The last of Astor Court. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
6 |
26 |
No. 15, 3/12/30, First steel hoisted into lot for bents for derrick. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
7 |
27 |
No. 16, 3/17/30, First steel set up for derrick foundation. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
7 |
28 |
No. 17, 3/17/30, First erection derrick being set up by Post & McCord. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
7 |
29 |
No. 19, 3/18/30, Sidewalk bridge offices along 5th Ave. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
7 |
30 |
No. 20, 3/18/30, Sidewalk bridge offices. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
7 |
31 |
No. 21, 3/21/30, Excavation-nearly complete. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
7 |
32 |
No. 23, 3/27/30, Post & McCord riggers setting up guy derrick. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
7 |
33 |
No. 22, 3/27/30, Fastening guy wires to spider. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
8 |
34 |
No. 24, 3/28/30, Setting up derricks. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
8 |
35 |
No. 26, 3/29/30, Cribbing for derricks, transit-mix truck delivering concrete. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
8 |
36 |
No. 25, 3/28/30, Pipe and ventilating trench and pier holes. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
8 |
37 |
No. 28, 4/1/30, View of steel erection derricks (9-used for first set-up). 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
8 |
38 |
No. 29, 4/1/30, First grillages set on piers. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
8 |
39 |
No. 27, 4/1/30, Hoisting in first grillage (8 tons). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
8 |
40 |
No. 30, 4/2/30, Distributing grillages. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
9 |
41 |
No. 31, 4/2/30, Geo. J. Atwell Co., 16 ton Moore speed crane being hoisted from lot. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
9 |
42 |
No. 32, 4/2/30, Swinging 16 tons of Moore speed crane. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
9 |
43 |
No. 33, 4/2/30, Moore speed crane being hoisted to 33rd St. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
9 |
44 |
No. 34, 4/2/30, Smashing on first bounce--Ramp supports. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
9 |
45 |
No. 36, 4/5/30, Concrete flowing from transit-mix truck to hopper. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
9 |
46 |
No. 35, 4/5/30, Concrete flowing to hopper from street delivery. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
10 |
47 |
No. 46, 4/4/30, Early steel columns 5th Ave. side--Concrete runways to grillages. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
10 |
48 |
No. 37, 4/5/30, Grillage set on pier--Ready for concrete forms. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
10 |
49 |
No. 38, 4/5/30, Concrete wood forms around grillage and reinforcing anchor bars. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
10 |
50 |
No. 39, 4/5/30, Boxed grillages being wet down before grouting. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
10 |
51 |
No. 40, 4/5/30, Spreading grout around grillage. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
10 |
52 |
No. 41, 4/5/30, Grout (1:3 mix) being covered with 1:2:4 mix. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
10 |
53 |
No. 42, 4/5/30, Spreading 1:2:4 mix around grillage. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
11 |
54 |
No. 44, 4/5/30, Checking center of a grillage completely grouted. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
11 |
55 |
No. 43, 4/5/30, Making surface mixture (1:2:4) level with top of billet plates. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
11 |
56 |
No. 47, 4/5/30, View of lot from 5th Ave. elevation. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
11 |
57 |
No. 48, 4/4/30, 34th St. sidewalk bridge looking east to 5th Ave. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
11 |
58 |
No. 45, 4/7/30, Wingplates of 28-ton column ready for bolting to billet plates. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
12 |
59 |
No. 56, 4/9/30, Hoisting column from 33rd St. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
12 |
60 |
No. 55, 4/9/30, Laying columns on basement floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
12 |
61 |
No. 52, 4/7/30, Raising column 89 to set. Weight 27 ½ tons. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
12 |
62 |
No. 51, 4/7/30, One derrick shifting Col. 117 to another derrick for setting. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
12 |
63 |
No. 50, 4/7/30, Tower foundation columns. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
12 |
64 |
No. 59, 4/9/30, Tower foundation columns (Col. 105 laving flat). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
13 |
65 |
No. 54, 4/8/30, Fallen "C" derrick 3:25 P.M. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
13 |
66 |
No. 65, 4/11/30, Setting Col. 115 ⅝72,795 lbs. (right) Col. 105--102,830 lbs. (the largest) ⅝14" x 26.8" x 13' base. 4 ⅝ x
2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
13 |
67 |
No. 60, 4/9/30, East center--2nd basement columns & beams. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
13 |
68 |
No. 62, 4/10/30, Tower foundation columns from 33rd St. (Man leaning on Col. 105--left hand Corner). 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
13 |
69 |
No. 57, 4/9/30, West end of lot. Cribbing of fallen "C" derrick vacant. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
13 |
70 |
No. 61, 4/10/30, Tower foundation columns & 1st basement floor beams (looking west). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
14 |
71 |
No. 53, 4/8/30, Typical steel floor, 1st basement floor, N.W. corner to south. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
14 |
72 |
No. 63, 4/10/30, Typical steel floor, 1st basement floor, N.E. corner to west. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
14 |
73 |
No. 64, 4/10/30, Painting 1st basement floor steel, S.W. corner to north. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
14 |
74 |
No. 58, 4/9/30, N. side of job from office window. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
14 |
75 |
No. 67, 4/14/30, 1st basement floor, protection decking, looking west. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
14 |
76 |
No. 68, 4/14/30, Safety decking--1st basement floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
15 |
77 |
No. 66, 4/14/30, Truck sunk in 33rd St. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
15 |
78 |
No. 71, 4/21/30, 2nd floor steel--34th St. side. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
15 |
79 |
No. 69, 4/15/30, 2nd & 3rd story columns, N.E. corner to west. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
15 |
80 |
No. 80, 4/26/30, 4th floor steel safely decked (police parade at rest). 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
15 |
81 |
No. 72, 4/21/30, Jumping up derrick "E" to 2nd floor (boom for mast). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
15 |
82 |
No. 81, 4/26/30, 4th floor steel--S.E. to N.W. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
16 |
83 |
No. 76, 4/25/30, Col. 115, 2nd & 3rd stories. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
16 |
84 |
No. 77, 4/25/30, Setting Col. 97--2nd & 3rd stories. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
16 |
85 |
No. 75, 4/25/30, Marking Col. 97--2nd & 3rd stories. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
16 |
86 |
No. 73, 4/25/30, 2nd & 3rd story tower columns. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
16 |
87 |
No. 74, 4/25/30, 2nd & 3rd story columns, N.E. corner. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
16 |
88 |
No. 70, 4/16/30, Setting 2nd floor beam. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
16 |
89 |
No. 82, 5/2/30, Riveters at Col. 9--2nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
17 |
90 |
No. 79, 4/26/30, Expanded metal beam clips--2nd floor. 4 ⅝ x 2 ¾ in |
1930 |
|
|
|
Page |
Image |
Title |
Date |
17 |
91 |
No. 117, 5/21/30, Beam clips--6th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
17 |
92 |
No. 89, 5/2/30, Hanger wire holding soffit form to 2nd floor spandrel beam. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
17 |
93 |
No. 87, 5/2/30, Hanger wire holding soffit forms--2nd floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
17 |
94 |
No. 94, 5/6/30, Soffit and side forms joisted--2nd floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
17 |
95 |
No. 88, 5/2/30, Wire hangers and soffit forms--2nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
17 |
96 |
No. 116, 5/21/30, Beam clips--6th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
18 |
97 |
No. 86, 5/2/30, Soffit and side forms--2nd floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
18 |
98 |
No. 106, 5/17/30, Soffit, side & slab forms--6th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
18 |
99 |
No. 91, 5/3/30, Side and soffit forms joisted--2nd Fl. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
18 |
100 |
No. 103, 5/2/30, Soffit forms ribbed and joisted, 2nd floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
18 |
101 |
No. 95, 5/6/30, Side and slab forms--2nd floor. 2 ¾ x 4 ⅝ in. Lower left corner torn. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
19 |
102 |
No. 108, 5/17/30, Soffit forms of 6th Fl. Above slab forms, mesh & toggles--5th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
19 |
103 |
No. 166, 6/21/30, Ceiling hanger (toggles) in finished arch--2nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
19 |
104 |
No. 107, 5/17/30, Slab forms--5th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
19 |
105 |
No. 96, 5/7/30, Slab forms with mesh and conduit--2nd floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
19 |
106 |
No. 97, 5/7/30, Running conduit over mesh on slab forms of 2nd floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
19 |
107 |
No. 104, 5/12/30, Floor arch forms completed--3rd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
19 |
108 |
No. 105, 5/12/30, Floor arch forms--3rd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
20 |
109 |
No. 114, 5/22/30, Concreting 6th floor setback capacity concrete buggy--(6) cubic ft. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
20 |
110 |
No. 113, 5/22/30, Concreting 6th floor setback. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
20 |
111 |
No. 98, 5/8/30, Concreting 2nd floor slab. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
20 |
112 |
No. 99, 5/9/30, 2nd floor concrete slab set 24 hours. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
20 |
113 |
No. 115, 5/22/30, "Goulashers" concreting, 6th floor setback. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
20 |
114 |
No. 83, 5/2/30, 59 conduits to one panel box--first floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
21 |
115 |
No. 84, 5/2/30, 33rd St. side of building. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
21 |
116 |
No. 85, 5/2/30, 33rd St. and 5th Ave. corner of building (5 stories). 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
21 |
117 |
No. 100, 5/9/30, 33rd St. and sides of building (8 stories). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
21 |
118 |
No. 101, 5/9/3, 34th St. and sides of building (8 stories). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
21 |
119 |
No. 102, 5/10/30, 34th St. and 5th Ave. corner of building (8 stories). 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
22 |
120 |
View from Empire State Building--looking north towards Central Park. 8 x 10 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
23 |
121 |
View from Empire State Building--looking towards Chrysler Bldg. 7 ½ x 10 in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
24 |
122 |
No. 109, 5/12/30, Columns forms clamped and reinforcing bars for basement retaining wall. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
24 |
123 |
No. 124, 5/27/30, Top of 2nd basement retaining wall. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
24 |
124 |
No. 145, 6/11/30, ½ bag hand-tilting, gasoline concrete mixer. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
24 |
125 |
No. 181, 7/16/30, Concreted column, 1st basement. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
24 |
126 |
No. 170, 7/16/30, Column 108--2nd basement all concreted (except windbraces). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
24 |
127 |
No. 376, 11/14/30, New steel set under 34th sidewalk before Waldorf steel removed. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
25 |
128 |
No. 110, 5/17/30, Hopper for sand and cinders, 1st basement. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
25 |
129 |
No. 111, 5/17/30, Ransome ¾ yard mixer (fed by hopper above) and 1 cubic yard Lakewood bucket for hoisting--2nd basement.
4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
25 |
130 |
No. 385, 11/21/30, First floor, sand and cinder bin in 1st basement (shown on left) filled at this place on main floor. 2
¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
25 |
131 |
No. 390, 12/6/30, Columns and windbracing in tower section--2nd basement. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
25 |
132 |
No. 112, 5/17/30, Rocker dump car (Koppel) on track to brick hopper, 1st basement. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
25 |
133 |
No. 144, 6/11/30, 1st basement, cement bag chute [brick-- h]opper. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
26 |
134 |
No. 121, 5/22/30, Riveter at his force (heater). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
26 |
135 |
No. 121-A, 5/22/30, Riveters on 6th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
26 |
136 |
No. 123, 5/23/30, Riveters and carpenters working on 9th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
26 |
137 |
No. 119, 5/21/30, Decking on 10th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
26 |
138 |
No. 120, 5/21/30, 10th floor decking--11th and 12th floor steel (looking West [------ 5th] Ave. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
26 |
139 |
No. 122, 5/23/30, 11-storeis of steel. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
26 |
140 |
No. 118, 5/21/30, 33rd Street and Fifth Ave. corner. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
27 |
141 |
No. 139, 6/11/30, 2nd basement, weepers (4" agricultural tile) on base concrete--ready for crushed stone covering. 2 ¾ x 4
⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
27 |
142 |
No. 142, 6/11/30, 2nd basement, concrete runways are laid on crushed stone and reinforcing rods of basement floor. 2 ¾ x 4
⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
27 |
143 |
No. 141, 6/11/30, Crushed stone and reinforcing rods of basement floor. Weeper (drainage tile in foreground). 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
27 |
144 |
No. 140, 6/11/30, 2nd basement, weeper (4" drain tile) on cinder concrete base. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
27 |
145 |
No. 143, 6/11/30, Reinforced concrete sump pump--sub-basement. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
28 |
146 |
No. 185, 7/8/30, 2nd basement floor showing: weeper drainpipe, crushed stone layer, reinforcing rods, cinder concrete layer,
finish concrete layer, hydrolithic waterproofing. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
28 |
147 |
No. 125, 6/4/30, Clipping wires of soffit forms. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
28 |
148 |
No. 186, 7/8/30, 2nd basement floor, cinder concrete, finish concrete, hydrolithic waterproofing. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
28 |
149 |
No. 152, 6/14/30, Ready for stripping concrete slab forms. Protection nets. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
28 |
150 |
No. 171, 7/9/30, Stripping concrete slab and soffit floor arch forms. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
29 |
151 |
No. 175, 7/2/30, Concreting columns of first floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
29 |
152 |
No. 174, 7/2/30, Ramming flow of concrete into first floor column forms. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
29 |
153 |
No. 150, 6/14/30, Face brick (buff) wall, west property line. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
29 |
154 |
No. 151, 6/14/30, Bricklayers scaffold and outriggers at face brick wall. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
29 |
155 |
No. 153, 6/18/30, Face brick wall completed. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
30 |
156 |
No. 177, 7/2/30, Side rocker dump car being loaded with common brick from hopper, first basement. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
30 |
157 |
No. 160, 6/18/30, Carload of brick being rolled onto material hoist--1st basement. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
30 |
158 |
No. 263, 9/17/30, Industrial R.R. track on 72nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
30 |
159 |
No. 229, 8/6/30, Heavy limestone blocks on flatcar, first floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
30 |
160 |
No. 130, 6/6/30, Portable track for dump cars and flatcars--6th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
30 |
161 |
No. 159, 6/18/30, Flatcar of limestone on material hoist--1st floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
31 |
162 |
No. 138, 6/11/30, Setting limestone and metal trim, 6th and 7th floors. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
31 |
163 |
No. 137, 6/11/30, Setting limestone--6th story, setting chrome steel trim--7th and 8th floors. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
31 |
164 |
No. 131, 6/6/30, Setting limestone S.W. corner, 6th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
31 |
165 |
No. 146, 6/11/30, Flatcar 3'-4"x 5'-6" ready for limestone in "Nebco" sling. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
31 |
166 |
No. 158, 6/18/30, Lifting limestone with "Nebco" sling, onto flatcar. Overhead Chisolm-Moore electric hoist on I-beam trolley.
4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
31 |
167 |
No. 182, 7/8/30, Strippers protection net; metal trim; scaffold machine ready for planks. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
31 |
168 |
No. 157, 6/18/30, Limestone--S.W. cor. 6th, 7th and 8th stories. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
32 |
169 |
No. 165, 6/21/30, Cast aluminum spandrel and Allegheny metal trim; showing anchors for masonry. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
32 |
170 |
No. 203, 7/17/30, Applying dampproofing compound on common brick exterior wall backup. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
32 |
171 |
No. 148, 6/13/30, Metal being backed up with common brick--6th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
32 |
172 |
No. 223, 8/1/30, Typical window stenciled "ES," walls dampproofed, radiator recessed to be painted with waterproof paint.
4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
32 |
173 |
No. 147, 6/11/30, Spandrel and metal trim anchors to brick wall. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
32 |
174 |
No. 202, 7/17/30, Calking [sic] between window sill and top of outside cast aluminum spandrel. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
33 |
175 |
No. 187, 7/9/30, Hand winch mounted on "A" frame for setting limestone--21st floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
33 |
176 |
No. 188, 7/9/30, Dobbie winch for setting limestone, 21st floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
33 |
177 |
No. 163, 6/21/30, Stone hand winch attached to column (13th floor) rigged for setting limestone on 11th floor. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
33 |
178 |
No. 162, 6/20/30, Stone hand winch (Dobbie) on 13th floor rigged for setting stone on 11th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
33 |
179 |
No. 280, 9/20/30, Protection "catchall" net laid on outrigger scaffold frame--59th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
33 |
180 |
No. 164, 6/25/30, Hand stone winch in operation. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
33 |
181 |
No. 161, 6/20/30, Dobbie hand winch and block, 13th floor (for setting stone on 11th floor). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
34 |
182 |
No. 126, 6/4/30, Plumbing brick backup wall. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
34 |
183 |
No. 127, 6/4/30, Setting copper flashing over brick wall--6th floor setback. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
34 |
184 |
No. 132, 6/6/30, Setting stone--suspended by grab, 6th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
34 |
185 |
No. 155, 6/18/30, Setting stone suspended by "Horton" lewis--8th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
34 |
186 |
No. 133, 6/6/30, Backing up with common brick between limestone and concrete. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
34 |
187 |
No. 156, 6/18/30, Setting stone--suspended by a lewis--Mortar being troweled as stone descends--8th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
35 |
188 |
No. 179, 7/2/30, Metal door frame and hollow tile fireproofing--8th floor stairway. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
35 |
189 |
No. 218, 7/25/30, Two barrows of hollow tile on material hoist no. 11--1st floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
35 |
190 |
No. 205, 7/17/30, Bricklayer scaffold machines in permanent elevator shafts, 12th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
35 |
191 |
No. 205, 7/17/30, Bricklayer scaffold machines in permanent elevator shaft--12th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
35 |
192 |
No. 197, 7/15/30, Bricklayer scaffolds for fireproofing permanent elevator shaft--9th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
36 |
193 |
No. 220, 7/25/30, 5th floor, supply ducts for ventilation covered with asbestos--supplying hot or cold air from heating or
cooling apparatus--. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
36 |
194 |
No. 237, 7/30/30, 24th floor, Wire mesh protection of hod hoist shaft showing in floor above. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
36 |
195 |
No. 247, 8/25/30, "Flax-Li-Num", Soundproofing around inner tile partition of elevator machinery room. Outside tile partition
still to be laid. N.B. ⅝inner partition rests on cork. Another layer of cork inserted between top of partition and ceiling.
4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
36 |
196 |
No. 238, 7/30/30, Hod hoist shaft--24th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
37 |
197 |
No. 201, 7/16/30, Outrigger protection scaffold, 15th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
37 |
198 |
No. 200, 7/15/30, Underview of outrigger protection scaffold--on 15th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
37 |
199 |
No. 225, 8/1/30, Bracing of outrigger scaffold--15th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
37 |
200 |
No. 173, 6/28/30, Outrigger scaffold supports on 21st floor for hanging scaffolds for stone work. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
37 |
201 |
No. 135, 6/6/30, "Patent" scaffolds (bricklayer type), 6th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
37 |
202 |
No. 136, 6/11/30, "Patent scaffolds for stonesetters, 6th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
37 |
203 |
No. 134, 6/6/30, "Patent" scaffolds (bricklayer type) for stonesetters. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
38 |
204 |
No. 230, 8/6/30, Safety protection nets hung from windows of 24th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
38 |
205 |
No. 227, 8/6/30, 44th to 52nd stories: showing stages of floor construction from structural steel to metal trim. 4 ⅝ x 2 ¾
in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
38 |
206 |
No. 246, 8/25/30, Patching temporary elevator opening, 13th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
38 |
207 |
No. 242, 8/13/30, Stiffleg derricks and swinging scaffolds along 33rd St. side. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
38 |
208 |
No. 243, 8/13/30, Stiffleg derrick hoisting limestone from 5th Ave. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
39 |
209 |
No. 194, 7/15/30, Dumping debris in dirt chute--9th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
39 |
210 |
No. 195, 7/15/30, Loading truck with debris from hopper of dirt chute--1st. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
39 |
211 |
No. 189, 7/9/30, Wire mesh on column windbraces ready for fireproofing with concrete. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
39 |
212 |
No. 207, 7/18/30, Temporary wooden water tank 4000 gals, 20th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
39 |
213 |
No. 192, 7/15/30, Laying concrete >scratch coat< on windbraces--12th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
39 |
214 |
No. 193, 7/15/30, Finish coat of concrete on windbraces--12th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
40 |
215 |
No. 167, 6/21/30, Office looking towards switchboard, 5h Ave. sidewalk bridge. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
40 |
216 |
No. 314, 10/6/, Jim McDermott--material clerk at his shanty--main floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
40 |
217 |
No. 178, 7/2/30, Foremen and engineers' shanty--2nd floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
40 |
218 |
No. 191, 7/9/30, Timekeepers' shanty--1st floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
40 |
219 |
No. 190, 7/9/30, Workmens' restaurant--3rd floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
40 |
220 |
No. 361, 10/30/30, Dr. Arthur Leistyna treating minor accident case in job hospital on 5th Ave. sidewalk bridge. 4 ⅝ x 2 ¾
in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
41 |
221 |
No. 216, 7/24/30, Hoisting limestone from street with "Nebco" manila slings. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
41 |
222 |
No. 208, 7/23/30, Cutting holes for stone lewises (2 lewises set in limestone block). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
41 |
223 |
No. 222, 7/26/30, Sasgen (3 ton) derricks and larger stiff leg derrick for lifting stone--6h floor setback. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
41 |
224 |
No. 212, 7/24/30, Stiffleg Sasgen derrick (3 ton capacity) 36 ft. boom, double drum hand winch for lifting stone. 2 ¾ x 4
⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
41 |
225 |
No. 213, 7/24/30, Back view of first tier of limestone on 2nd floor showing anchors mortared in stone. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
41 |
226 |
No. 214, 7/25/30, Swinging scaffolds for stone erection--2nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
41 |
227 |
No. 224, 8/1/30, Swinging scaffold; limestone anchored to brick backup; spandrel beam. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
42 |
228 |
No. 261, 9/18/30, Calking [sic] casement window metal frame with compound--2nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
42 |
229 |
No. 262, 9/18/30, Setting casement sash, 2nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
42 |
230 |
No. 228, 8/6/30, Fiber ducts for low tension wires--running width of 15th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
42 |
231 |
No. 290, 9/26/30, Laying ¾" roofing tile for promenade, 6th floor setback. Place on concrete arch is following: ⅝screed coat
1", roofing cork insulation--1", tarpaper and pitch waterproofing protection coat 1" cement mortar. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
42 |
232 |
No. 346, 10/30/30, Calking [sic] between window frame and stone. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
42 |
233 |
No. 289, 9/26/30, Pitch waterproofing--6th floor setback. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
43 |
234 |
No. 243-A, 8/1/30, Stiffleg derrick hoisting stone from 5th Ave. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
43 |
235 |
No. 222-A, 7/26/30, Sasgen stiffleg derricks on 6th floor--S.E. corner. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
43 |
236 |
No. 214-B, 7/25/30, Swinging scaffolds--2nd floor, 5th Ave. side. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
43 |
237 |
No. 373, 11/13/30, 1" cork insulation covered with pitch waterproofing and tarpaper. Then to be covered with a 1" protection
coat of cement and ¾" roofing tile. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
43 |
238 |
No. 372, 11/13/30, 1" cork insulation covered with pitch waterproofing and tarpaper. Then to be covered with a 1" protection
coat of cement and ¾" roofing tile. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
44 |
239 |
No. 208-A, 7/22/30, Setting limestone--2nd floor, cor. 33rd St. and 5th Ave. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
44 |
240 |
No. 214-A, 7/25/30, Swinging scaffolds and outriggers, 2nd floor--5th Ave. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
44 |
241 |
No. 285, 9/26/30, Armored Service Co. paying men in field. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
44 |
242 |
No. 256, 9/12/30, Black Swedish granite column ready for B. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
44 |
243 |
No. 255, 9/23/30, Black Swedish granite of lintel course being set 6th Ave. entrance. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
45 |
244 |
No. 317, 10/15/30, Cathead sheaves top of host shaft, 62nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
45 |
245 |
No. 359, 10/30/30, Mixer-hopper and concrete bucket, 2nd basement. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
45 |
246 |
No. 295, 9/27/30, 48" sheaves in catheads of material hoist--81st floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
45 |
247 |
No. 291, 9/26/30, 48" sheaves in catheads of material hoists--81st floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
45 |
248 |
No. 332, 10/22/30, Material hopper and concrete mixer--2nd basement. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
45 |
249 |
No. 324, 10/17/30, Material hoist cathead on 86th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
45 |
250 |
No. 331, 10/22/30, Concrete mixer and hoist bucket loaded 2nd basement. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
46 |
251 |
No. 299, 10/1/30, Loading hollow tile on material hoist--1st floor--(6" x 12" x 12" smoothe). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
46 |
252 |
No. 330, 10/18/30, Mono-rail hoist "Chisolm-Moore" on 2nd floor ceiling. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
46 |
253 |
No. 298, 10/1/30, Load of 4" x 12" x 12" rough hollow tile on flatcar--1st floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
46 |
254 |
No. 405, 12/20/30, Showing operation of bell and phone signal system (Bedell) for material hoist--1st floor. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
46 |
255 |
No. 377, 11/15/30, 43 bags plaster (4300 lbs.), 1st floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
46 |
256 |
No. 406, 12/20/30, 1st floor, no. 2 material hoist running to 80th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
47 |
257 |
No. 204, 7/17/30, Metal lath around pipes after wall dampproofed--8th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
47 |
258 |
No. 226, 8/1/30, Furring column with 2 ¼" x 8" x 12" solid tile covering--21st floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
47 |
259 |
No. 209, 7/22/30, 7th floor--fibre underfloor ducts--for telephone, telegram and low tension wire systems. Rough concrete
arch has screeded path for the reception of these ducts. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
47 |
260 |
No. 211, 7/22/30, 7th floor, cinder fill concrete; wire mesh; cement finish floor; Strip of Tomahawk roofing paper used for
protection and curing floors. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
47 |
261 |
No. 210, 7/22/30, 7th floor, underfloor fibre ducts--covered with cinder concrete fill and finish cement floor. 2 ¾ x 4 ⅝
in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
47 |
262 |
No. 297, 8/27/30, Metal lath on ceiling of elevator hall--7th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
47 |
263 |
No. 386, 11/21/30, Main floor, Handling bags of cement with tongs. Down chute to hopper--1st basement. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
48 |
264 |
No. 129, 6/4/30, Hoisting column from 33rd St. to 15th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
48 |
265 |
No. 176, 7/2/30, Hoisting steel--also concrete bucket to 26th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
48 |
266 |
No. 154, 6/18/30, 6th to 20th floors. Limestone set--6th and 7th floors. Metal trim set--8th and 9th floors. Stripping arches
on 16th floor. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
48 |
267 |
No. 154-A, 6/18/30, Showing progress of stone and metal, also scaffolds and outriggers. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
48 |
268 |
No. 172, 6/25/30, 5-derricks on 28th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
48 |
269 |
No. 128, 6/4/30, 7th to 16th floors showing concrete arch forms and steel. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
48 |
270 |
No. 215, 7/24/30, Hoisting steel and lumber to 26th floor--33rd St. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
49 |
504* |
No. 149-A-B, 6/14/30, 21st and 22nd floors of steel, 6th story on stone. 4 ⅝ x 4 ½ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
49 |
271 |
No. 169, 6/25/30, 6th to 27th stories, 12th story on stone. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
49 |
272 |
No. 221, 7/26/30, Setting columns for 44th and 45th floors, 43rd floor of steel, 35th floor on metal trim, 29th floors on
limestone, derricks on 6th floor setback setting limestone--2nd, 3rd, 4th, 5th stories. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
49 |
505* |
No. 168-A-B, 6/21/30, 25th floor of steel--9th story on stone. 4 ½ x 5 in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
49 |
273 |
No. 180, 7/8/30, 32nd floor of steel, 20th story on stone. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
50 |
274 |
Night view of east and north sides of building. 9 ⅝ x 7 ⅝ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
51 |
NA |
Night view--looking south from 86th floor--main roof. [Photograph missing] |
|
Page |
Image |
Title |
Date |
52 |
275 |
No. 219, 7/25/30, Temporary A.B. see passenger car to 30th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
52 |
276 |
No. 183, 7/8/30, Cathead of material hoist--21st floor. . 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
52 |
277 |
No. 199, 7/12/30, "Thomas" hoisting engine, 200 H.P.-A.C. ⅝single drum ⅝one cable--8800 lbs. lift at 600 ft. P.M. operating
material hoist. 2 ¾ x 4
⅝ in
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
52 |
278 |
No. 198, 7/15/30, "Lidgerwood" hoist engine, 63 H.P.-A.C. ⅝single drum--one cable--4000 lbs. lift at 300 ft. P.M. has every
known safety device--operating passenger hoist. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
52 |
279 |
No. 184, 7/8/30, Dump car of common brick on 21st floor setback double catheads for material hoist. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
52 |
280 |
No. 206, 7/18/30, Temporary "mine case hoist" passenger elevator. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
52 |
281 |
No. 217, 7/24/30, Typical protection caging on sides on material hoist shafts. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
53 |
282 |
No. 244, 8/25/30, Brown coat of plaster on rough tile (drying out) ⅝14th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
53 |
283 |
No. 245, 8/25/30, Brown coat on rough tile, white finish plaster on ceiling. Cardiff green marble base. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
53 |
284 |
No. 282, 9/20/30, Finish and brown coats of plaster--17th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
53 |
285 |
No. 279, 9/20/30, Typical staircase showing fire riser and hose. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
53 |
286 |
No. 329, 10/18/30, Finish plaster--brown plaster and rough tile--wall of stairway. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
53 |
287 |
No. 310, 10/6/30, Fire tower--6th floor--showing temporary light switches and wiring--fire standpipe. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
54 |
288 |
No. 257, 9/16/30, Swedish black column--5th Ave. entrance. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
54 |
289 |
No. 258, 9/17/30, Protection of black granite [illegible--] backup shown. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
54 |
290 |
No. 283, 9/23/30, Setting Swedish black granite--5th Ave. entrance. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
54 |
291 |
No. 300, 10/2/30, Setting lewises in 8 ton column section of Indiana limestone. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
54 |
292 |
No. 302, 10/2/30, Top of [concrete--] ready to receive next section. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
54 |
293 |
No. 264, 9/19/30, Allegheny metal trim head, 71st floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
54 |
294 |
No. 301, 10/2/30, Hoisting 8 ton limestone column from street. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
55 |
295 |
No. 348, 10/30/30, Chisolm-Moore trolley hoist carrying block of limestone to flat car--main floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
55 |
296 |
No. 326, 10/17/30, 12-lb. 26 gauge industrial track--85th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
55 |
297 |
No. 343, 10/30/30, Limestone block--6' x 4'8" x 1'6" (3 ½ tons) for 85th floors. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
55 |
298 |
No. 327, 10/17/30, Track--turntable and flatcar of limestone on 85th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
55 |
299 |
No. 350, 10/30/30, 3 ½ ton limestone block on hoist, 1st floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
55 |
300 |
No. 325, 10/17/30, Breast derrick on 85th floor [illegible--]. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
56 |
301 |
No. 308, 10/3/30, Metal trim head and spandrel anchored to both floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
56 |
302 |
No. 306, 9/24/30, Backing up metal trim and spandrel with red brick--[3]2nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
56 |
303 |
No. 307, 10/3/30, Anchoring spandrel and metal trim to floor beams. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
56 |
304 |
No. 333, 10/22/30, Stonemen's scaffolds and metal trim heads on 33rd St. side--85th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
56 |
305 |
No. 309, 10/3/30, Double Allegheny metal trim head and aluminum spandrel--80th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
56 |
306 |
No. 323, 10/17/30, Stonemen's scaffolds and rigging on 33rd side, 82nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
57 |
307 |
No. 303, 10/2/30, Swinging column section into place. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
57 |
308 |
No. 338, 10/27/30, Eagle being set atop south column of 5th Ave. entrance ⅝5th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
57 |
309 |
No. 304, 10/2/30, Setting limestone. Column into place. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
57 |
310 |
No. 336, 10/27/30, Carved limestone eagle hoisted to 5th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
57 |
311 |
No. 305, 10/2/30, Limestone column section set 5th Ave. entrance. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
57 |
312 |
No. 339, 10/28/30, Eagle set on south column 5th Ave. entrance. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
58 |
313 |
No. 340, 10/28/30, Pointing limestones--5th Ave. side. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
58 |
314 |
No. 410, 1/7/30, Finish plastering of ceiling on 78th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
58 |
315 |
No. 341, 10/28/30, Washing down and pointing limestone. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
58 |
316 |
No. 347, 10/30/30, The last day for sidewalk bridge offices--5th Ave. & 33rd St. Painting and washing down stone. Scaffolding
at 5th Ave entrance for setting columns. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
58 |
317 |
No. 316, 10/11/30, Limestone column anchored and backed up with common brick--5th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
58 |
318 |
No. 375, 11/4/30, Section 4th floor ceiling showing: concrete arch, asbestos covered ducts, metal lath of hung ceiling, with
scratch coat of plaster, brown coat of plaster, finish coat of plaster. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
59 |
319 |
No. 355, 10/29/30, Unloading sheet metal from hoist on 84th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
59 |
320 |
No. 368, 11/11/30, Setting register grill over vent duct, 4th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
59 |
321 |
No. 315, 10/11/30, Vent ducts, 5th story ceiling--5th Ave. side intake. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
59 |
322 |
No. 311, 10/6/30, Metal lath ceiling and vent ducts. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
59 |
323 |
No. 328, 10/18/30, Metal lath--pipes and ducts--29th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
59 |
324 |
No. 407, 12/30/30, Column covered with metal lath showing corner bead; underfloor duct junction box; 3 outlet boxes; vacuum
outlet; waste pipe line; also wood grounds for metal base. Column in rear shows base (metal) to be installed; also hose cabinet.
4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
60 |
325 |
No. 319, 10/18/30, Elevator lobby--33rd floor. Black terrazzo marble (below black and cardiff green) sections set before white
(Botticino) section. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
60 |
326 |
No. 369, 11/11/30, Rubbing down terrazzo floor, 40th floor elevator hall. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
60 |
327 |
No. 318, 10/15/30, Elevator lobby--33rd floor. Brass expansion strips embedded in floor fill bed ready for terrazzo marble
chips. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
60 |
328 |
No. 296, 9/27/30, Finish terrazzo floor--elevator hall--7th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
61 |
329 |
No. 351, 10/29/30, 12-transformers sidetracked on 78th Fl. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
61 |
330 |
No. 313, 10/8/30, Compressors (Atwell's) on 34th St. sidewalk being dismantled. 2 compressors--capacity each 1245 cu. ft.
per minute. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
61 |
331 |
No. 352, 10/29/30, Transformers 200KVA 13,800 volt primary 5000lbs each, for 84th floor being relayed on 78th floor. 2 ¾ x
4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
61 |
332 |
No. 353, 10/29/30, Installing electricians--with transformers on 78th floor--being relayed to 84th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
61 |
333 |
No. 354, 10/29/30, Using chain block to lift transformer from flat car to rollers--84th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
61 |
334 |
No. 312, 10/8/30, Dismantling compressors. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
62 |
335 |
No. 234, 8/7/30, 41st floor, 12-single phase transformers--200 KW, 13,750 V to 125 V--weight each--3810 lbs. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
62 |
336 |
No. 253, 8/29/30, Splice box in 2nd basement connects cable from 41st floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
62 |
337 |
No. 252, 8/27/30, Switches for 41st floor transformers. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
62 |
338 |
No. 236, 8/7/30, Two-2-stage electric compressors capacity each 1245 cu. ft. per min. used for wrecking; foundations; also
for
structural steel erection. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
62 |
339 |
No. 235, 8/7/30, One of the two-2-stage electric compressors, capacity each 1245 cu. ft. per min. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
63 |
340 |
No. 370, 11/11/30, Pulling cable (700,000 C.M. varnished cambric) being dropped from 41st floor pull box under switch board
B to 27th floor elevator. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
63 |
341 |
No. 371, 11/11/30, Dropping 3 cables from pull box under switchboard "B" 41st floor to 27th floor elevators. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
64 |
342 |
No. 345, 11/15/30, Stream meters reading in units up to 10,000,000 lbs. in steam meter room--2nd basement. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
64 |
343 |
No. 374, 11/15/30, Vacuum pumps in steam meter room used in connection with heating system. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
64 |
344 |
No. 396, 12/10/30, 50 lb. line to low pressure reducing valves on heating main for 6th to 85th floors, 2nd basement steam
meter room. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
64 |
345 |
No. 344, 10/24/30, Two hot water heaters and two steam condensate preheaters (below), Steam meter room--2nd basement. 2 ¾
x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
64 |
346 |
No. 395, 12/10/30, 24" heating line for 6th to 85th floors with 20" valve, 2nd basement ⅝steam meter room. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
65 |
347 |
No. 391, 12/6/30, Elevator pit--Bank G-- Car 4. In secondary state of completion before enclosing with brick wall. Showing:
oil buffer for car compression; safety speed governor tension frame (at bottom); traveling cable hanging from car platform
ready to be tested and connected; wire connect to junction box on car. 1st basement. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
65 |
348 |
No. 393, 12/6/30, Car no. 1--Bank G--1st floor. In secondary stage of completion before enclosing with brick wall. Showing:
car platform with shield off of platform--allowing view of junction box with terminal box and wires hanging under car connected
to marked test boards; small box on right contains signal equipment which will work in conjunction with scheduling device
regulating the timing of start of elevators away from main floor. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
65 |
349 |
No. 392, 12/6/30, Car no. 10--Bank G--1st floor. In secondary stage of completion before enclosing with brick wall. Showing:
car frame with safety beams and safety clutches; junction boxes (under car which traveling cable fastens to); reinforcing
brackets on back of guide rails; temporary car switch template panel (in front); platform shield. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
66 |
350 |
No. 394, 12/6/30, Car no.4--Bank A--1st floor. Practically completed. Elevator door opening showing upper section of cab and
part of finish paneling of cab, and also mechanism mounted on top of car to operate door device. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
66 |
351 |
No. 408, 12/30/30, Exterior of finished dome for elevator cab showing: top emergency exit remove; illuminating boxes at corners
for lighting cabs; exterior part of metal decoration over which fan operates. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
67 |
352 |
No. 358-B, 11/10/30, Forms and mesh laid ready for concreting, 5th Ave. sidewalk arch. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
67 |
353 |
No. 358-A, [n.d.], Pouring concrete 5th Ave. sidewalk arch, transit-mix truck. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
67 |
354 |
No. 357, 11/7/30, Preparing new sidewalk for 5th Ave. ⅝forms laid. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
68 |
355 |
No. 259, 9/16/30, Bolting on 82nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
68 |
356 |
No. 269, 9/19/30 Sloping girders of 85th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
68 |
357 |
No. 260, 9/16/30, Tightening guys of derrick on 82nd floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
68 |
358 |
No. 270, 9/19/30, Setting steel N.E. corner--85th story. "Chrysler Bldg. in background." 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
68 |
359 |
No. 268, 9/18/30, Sil[h]ouette in clouds, setting beams on 84th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
68 |
360 |
No. 271, 9/19/30, Riding steel of 85th story--in rush for topping out ceremony. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
69 |
361 |
No. 273, 9/19/30, 3:30P.M. Raising flag at topping of steel on 86th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
69 |
362 |
No. 272, 9/19/30, Two ironworkers riding ball during erection of last two floors of steel. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
69 |
363 |
No. 265, 9/19/30, 9:30A.M., the last truckload of floor steel for 86th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
69 |
364 |
No. 266, 9/19/30, last load of floor steel being hoisted--33rd St. side. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
69 |
365 |
No. 277, 9/19/30, 3:30P.M. Flag raising at topping of steel 86th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
69 |
366 |
No. 278, 9/19/30, Flag at mast, N.E. corner, 86th floor (Chrysler Bldg. in background). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
70 |
367 |
No. 250, 8/27/30, Steelworkers on 66th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
70 |
368 |
No. 233, 8/6/30, Packing for hoisting aloft, 2000 lb. fall ball; 600 lb. 6-sheave block; rivets and blocks on steel girders.
4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
70 |
369 |
No. 248, 8/26/30, Setting derrick on 64th floor, columns for 65th and 66th floors. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
70 |
370 |
No. 232, 8/6/30, Hoisting steel at 25th floor transfer to 52nd floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
70 |
371 |
No. 249, 8/27/30, Setting columns for 67th and 68th floors. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
70 |
372 |
No. 231, 8/6/30, Steel at 25th floor transfer to be hoisted to 52nd floor transfer. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
71 |
373 |
No. 239, 8/19/30, 16th to 60th stories--S.E. corner. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
71 |
374 |
No. 240, 8/19/30, Looking up 60 stories from 5th Ave. 4 ⅝ x 2 ¾ in. Lower left corner damaged. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
71 |
375 |
No. 241, 8/19/30, Looking up 60 stories from 33rd St. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
71 |
376 |
No. 251, 8/27/30, Looking down on 5th Ave. from 51st floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
71 |
377 |
No. 254, 9/3/30, 72nd floor steel, metal trim--60th floor, floor arches--65th floor, stone--51st floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
71 |
378 |
No. 281, 9/20/30, 85 stories of steel complete. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
72 |
379 |
No. 267, 9/19/30, Last floor steel piece going up top hoist--33rd St. and 5th Ave. corner. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
72 |
380 |
No. 292, 9/27/30, Columns, beams and slabs--83rd floor. Large beam used for fastening guy wire of derrick. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
72 |
381 |
No. 288, 9/26/30, Riveting steel on 86th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
72 |
382 |
No. 287, 9/26/30, Riveting steel on 85th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
72 |
383 |
No. 293, 9/27/30, Soffits and beams of 86th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
72 |
384 |
No. 294, 9/27/30, Slabs and mesh on 84th floor. Soffit and beam forms on 85th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
72 |
385 |
No. 286, 9/26/30, 83rd-84th and 85th stories--east side. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
73 |
386 |
No. 284, 9/23/30, Building--85th stories. View from 26th floor of no. 2 Park Ave. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
73 |
387 |
[No.] S-40-B, 10/2/30, New Salmon Tower in foreground seen from 86th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
73 |
388 |
[No.] S-41, 10/2/30, Chrysler Building and East River thru columns 85th story. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
73 |
389 |
No. 342, 10/28/30, Building from 245 Fifth Ave. corner 29th St. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
73 |
390 |
No. 334-B, 10/20/30, Building from 245 Fifth Ave. cor. 29th St. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
73 |
391 |
[No.] S-40-A, 10/2/30 Chrysler Bldg.--Queensboro Bridge--East River--86th Fl. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
74 |
392 |
No. 335 10/20/30, View of Building from 1199 Broadway. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
74 |
393 |
No. 343, 10/28/30, View from 30th St. and 5th Ave. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
74 |
394 |
No. 321, 10/16/30, Piece of tower steel being hoisted from 33rd St. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
74 |
395 |
No. 320, 10/16/30, Tower steel on 1st and 2nd jump. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
74 |
396 |
No. 322, 10/22/30, Hoisting tower steel sections. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
75 |
397 |
No. 356, 10/28/30, Ladders from 87th to 89th floor of tower. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
75 |
398 |
No. 365, 11/10/30, From EE-3 of tower (96th Fl.) 1157' to EE-2 (94th Fl.) and 5th Ave. below. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
75 |
399 |
No. 360, 11/7/30, S.E. cor. Tower steel floors DD-EE-1 and E.E.-2. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
75 |
400 |
No. 366, 11/10/30, Building and tower--97 stories--1178'-9", 130'-5" of tower. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
75 |
401 |
No. 363, 11/10/30, East side of tower to EE-4. Equiv. to 97 stories--1178'-9". 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
75 |
402 |
No. 364, 11/10/30, West side of tower to EE-4. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
76 |
403 |
No. 397, 11/19/30, S.E. side tower steel AA to HH levels. Showing (two sides) 3 struts of lateral framing for glass. Corner
struts for aluminum wings. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
76 |
404 |
No. 381, 11/19/30, Fifth Avenue from HH floor (102nd) of tower. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
76 |
405 |
No. 380, 11/19/30, Tower steel from HH floor to top showing circular steel framing for beacon light housing. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
76 |
406 |
No. 383, 11/19/30, Beams connected to columns on GG floor (tower). 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
76 |
407 |
No. 378, 11/19/30, Tower steel from AA to HH--east side 3 center struts of lateral framing for glass corner struts for aluminum
wings. 4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
76 |
408 |
No. 382, 11/19/30, Beams connected to column on GG floor. Also part of lateral framing for glass. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
77 |
409 |
No. 400, 12/16/30, Navy blimp J-4 coming from east as seen from 90th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
77 |
410 |
No. 384, 11/19/30, S.W. rim of HH floor--(102nd), 5th Avenue below. (Post & McCord Ironworkers). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
77 |
411-2 |
No. 397-A, 12/10/30, Upper section S.E. corner of tower, No. 397-B, 12/10/30, Lower section base of tower--from 86th floor.
5 x 4 ½ in. Irregular shape.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
77 |
413 |
No. 398, 12/10/30, AA floor (base) of tower showing steel fireproofed. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
77 |
414 |
No. 402, 12/16/30, Navy blimp J-4 flying by north side of bldg. from 90th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
77 |
415 |
No. 401, 12/16/30, Navy blimp J-4 cruising N.E. over 5th Ave. ⅝seen from 90th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
78 |
416 |
No. 367, 11/11/30, Building of 1178'-9" including 130'-5" of tower (E-4 floor--97stories). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
78 |
NA |
No. 388, 11/24/30, A colossal shaft and tip 1250' high from 6th Ave. & 30th St. 4 ⅝ x 2 ¾ in. [Photograph missing] |
1930 |
Page |
Image |
Title |
Date |
78 |
417 |
No. 399, 12/16/30, Empire State Bldg. casts its shadow into Bryant Park--8 blocks away. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
78 |
418 |
No. 387, 11/29/30, Bldg. of 1252'--KK level = (103 stories). 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
78 |
419 |
No. 389, 11/24/30, View of 5th Ave. side. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
79 |
NA |
12/16/30, Navy blimp J-4 cruising around tower. 10 x 8 in. [Photograph missing] |
1930 |
Page |
Image |
Title |
Date |
80 |
420 |
[Scaffold around the tower--] 4 ⅝ x 2 ¾ in. |
|
|
|
|
Page |
Image |
Title |
Date |
80 |
421 |
1/12/31, No. 415, Sturtevant "Silentvane" supply fan for 1st, 4th and 5th floors, [1]0 HP G.E. motor. 4 ⅝ x 2 ¾ in. |
1931 |
|
|
|
Page |
Image |
Title |
Date |
80 |
422 |
No. 362, 9/24/30, Temporary storeroom--1st floor. 2 ¾ x 4 ⅝ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
80 |
423 |
1/12/31, No. 414, Sturtevant "Silentvane" exhaust fan for 1st-2nd-3rd-4th and 5th floors 10 H.P. G.E. motor. 4 ⅝ x 2 ¾ in.
|
1931 |
|
|
|
Page |
Image |
Title |
Date |
80 |
424 |
1/14/31, No. 419, Panel box showing 50 conduits some running along 1st floor. 4 ⅝ x 2 ¾ in. |
1931 |
|
|
|
Page |
Image |
Title |
Date |
80 |
425 |
12/20/30, No. 404, Operator of Thomas S.D. 200 H.P hoist--showing variable speed controllers and dial indicators operates
material hoist. 4 ⅝ x 2 ¾ in.
|
1931 |
|
|
|
Page |
Image |
Title |
Date |
80 |
426 |
1/5/31, No. 403, Panel box controlling directional signs throughout building and core lighting in main corridors--1st floor.
50 conduits. 4 ⅝ x 2 ¾ in.
|
1931 |
|
|
|
Page |
Image |
Title |
Date |
81 |
427 |
No. 420, 1/14/31, 7th floor, radiators "Murray" one enclosed--one exposed. 2 ¾ x 4 ⅝ in. |
1931 |
|
|
|
Page |
Image |
Title |
Date |
81 |
428 |
1/13/31, No. 422, Screwing metal baseboard on column ⅝47th floor. 2 ¾ x 4 ⅝ in. |
1931 |
|
|
|
Page |
Image |
Title |
Date |
81 |
429 |
No. 423, 1/13/31, Rough plastering on metal lath ceiling--4th floor. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
81 |
430 |
No. 421, 1/13/31, 47th floor, setting metal baseboard on column. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
81 |
431 |
No. 336, 10/27/30, Eagle carved in limestone hoisted to 5th floor scaffold. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
82 |
432 |
1-P, A.E. Smith & R.C. Brown. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
82 |
433 |
2-P, J. McInerney, A.E. Smith, R.C. Brown. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
82 |
434 |
3-P, A.E. Smith. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
82 |
435 |
10-P, D.P Earle. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
82 |
436 |
9-P, J.W. Bowser. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
82 |
437 |
15-P, Mr. and Mrs. J.W. Bowser, Jackie Bowser. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
82 |
438 |
P-34, H.J. Stellmann. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
82 |
439 |
14-P, J.P. Carmody. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
83 |
440 |
12-P, Jack McAuliffe. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
83 |
441 |
4-P, W.F. Bennett. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
83 |
442 |
13-P, J. Roberts. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
83 |
443 |
20-P, C. Henning, T. O'Hagan. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
83 |
444 |
W.F. Bennett--J.P. Carmody--T.F. Gunn. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
83 |
445 |
P-28, G. Dries--J. Steen--F. King. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
83 |
446 |
P-30, Andy Morrison, foreman for Post & McCord. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
83 |
447 |
P-31, J. Williams--inspector (De P. Hone Co.) and A. Morrison (Post & McCord). 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
84 |
448 |
Accounting, 8-P, W. Bingham--W.Granberry--C. Henning, F. Crothers--R. Velsey (front) A. Latimer. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
84 |
449 |
Field distribution checkers, P-26, T. Blackwell--E. Wilcox--A. Carew--H. McCormick--F. Lindblad, J. Kerwin, (seated) F. Crothers.
2 ¾ x 4 ⅝ in.
|
undated |
|
|
|
Page |
Image |
Title |
Date |
84 |
450 |
Cost distribution and production, P-25-B, A. Blackwell--W. Ferris--J. McKenna--J. Davis--K. Potterton, J. Soper. 2 ¾ x 4 ⅝
in.
|
undated |
|
|
|
Page |
Image |
Title |
Date |
84 |
451 |
Empire State Inc. inspectors, P-29, Mulhall--Mullen--Bergen--Theiss and Dunning. 2 ¾ x 4 ⅝ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
84 |
452 |
Field engineers, P-35, E. Peterson, F. Hickey, J. Meehan, W. Delmhorst, J.W. Boyes, J. MacNeal, Lee Snyder, Orville Keyes
and "Doc" Brown. 2 ¾ x 4 ⅝ in.
|
undated |
|
|
|
Page |
Image |
Title |
Date |
84 |
453 |
Nurse, Miss C. Lynch. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
85 |
454 |
P-38, 8/4/30, J. Carl--E. Judd--J. Scully--A. Hardman--W. Blais--J.W. Bowser. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
85 |
455 |
P-27, 8/11/30, O. Back--E. Judo--J. Carl--W. Whalen--H.J. Stellmann--J.W. Bowser. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
85 |
456 |
P-43, 10/8/30, J.H. Tarry--secy of Empire State, Inc. on 86th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
85 |
457 |
P-37A, 10/2/30, A. Hardman and W. Elais--86th floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
85 |
458 |
P-39, 10/1/30, E. Judo--J. Carl--A. Hardman. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
85 |
459 |
11-P, W.M. Blais. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
86 |
460 |
A study in cat life, [three cats on the deck]. 2 ¾ x 4 ⅝ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
86 |
461 |
A study in cat life, [cats sleeping on the desk]. 2 ¾ x 4 ⅝ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
86 |
462 |
A study in cat life, [mother cat looking after her four kittens]. 2 ¾ x 4 ⅝ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
86 |
463 |
A study in cat life, [a cat on the ladder]. 2 ¾ x 4 ⅝ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
86 |
464 |
A study in cat life, [mother cat and kittens playing on the deck]. 2 ¾ x 4 ⅝ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
86 |
465 |
A study in cat life, [mother cat carrying her kitten]. 2 ¾ x 4 ⅝ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
87 |
466 |
P-46, 11/19/30, Oscar Johnson and Herbert McCord of Post & McCord--at top of tower (1252') at topping off of tower steel.
4 ⅝ x 2 ¾ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
87 |
467 |
P-33-A, 9-26/30, Dick McCarthy and John Lawman of post & McCord--on 86th floor. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
87 |
468 |
P-49X, W.M. McCron, Supt. for L.K. Comstock. Co. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
87 |
469 |
P-47, 11/19/30, "Sluke" Ryersen and John Lowman of Post & McCord on HH tower level--1224'. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
88 |
470 |
More cats," [a cat on a stool]. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
88 |
471 |
More cats, [two cats]. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
88 |
472 |
More cats, [five kittens on the deck]. 2 ¾ x 4 ⅝ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
88 |
473 |
More cats, [three cats under a stool]. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
89 |
474 |
S-6, 3-alarm fire--April 14th, 1930--at 8-10 East 33rd St. as viewed from 5th Ave. sidewalk bridge. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
89 |
475 |
S-10, 3-alarm fire--April 14th, 1930--at 8-10 East 33rd St. as viewed from 5th Ave. sidewalk bridge. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
89 |
476 |
S-11, 3-alarm fire--April 14th, 1930--at 8-10 East 33rd St. as viewed from 5th Ave. sidewalk bridge. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
89 |
477 |
S-8, 3-alarm fire--April 14th, 1930--at 8-10 East 33rd St. as viewed from 5th Ave. sidewalk bridge. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
89 |
478 |
S-6[--], 3-alarm fire--April 14th, 1930--at 8-10 East 33rd St. as viewed from 5th Ave. sidewalk bridge. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
89 |
479 |
S-9, 3-alarm fire--April 14th, 1930--at 8-10 East 33rd St. as viewed from 5th Ave. sidewalk bridge. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
89 |
480 |
S-4, 3-alarm fire--April 14th, 1930--at 8-10 East 33rd St. as viewed from 5th Ave. sidewalk bridge. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
89 |
481 |
S-5, 3-alarm fire--April 14th, 1930--at 8-10 East 33rd St. as viewed from 5th Ave. sidewalk bridge. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
90 |
NA |
No. 276, 9/9/30, Cornerstone laying ceremony. 4 ⅝ x 2 ¾ in. [Photograph missing] |
1930 |
Page |
Image |
Title |
Date |
90 |
482 |
10/8/30, P-41, First award of craftsmanship certificates of the New York Building Congress. Lieut-Gov. Lehman making presentation
to "Tom" Walsh, hoisting engineer. Ex-Gov.--presiding. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
90 |
483 |
P-42, 10/8/30, R.C. Brown with Gov. Smith, who is speaking into "Mike" on 81st floor. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
90 |
484 |
No. 275, 9/9/30, Actual laying of corner stone south column--5th Ave. entrance. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
90 |
485 |
No. 274, 9/9/30, Gov. Smith speaking at cornerstone laying ceremonies. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
91 |
486 |
S-13, Police Parade, April 26th, 1930, viewed from 5th Ave. sidewalk bridge, rifle squad. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
91 |
487 |
S-16, Police Parade, April 26th, 1930, viewed from 5th Ave. sidewalk bridge, flag squad. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
91 |
488 |
S-12, Police Parade, April 26th, 1930, viewed from 5th Ave. sidewalk bridge, chaplains mounted. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
91 |
489 |
S-18, Police Parade, April 26th, 1930, viewed from 5th Ave. sidewalk bridge, motor squads. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
91 |
490 |
S-14, Police Parade, April 26th, 1930, viewed from 5th Ave. sidewalk bridge, rifle squad. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
91 |
491 |
S-15, Police Parade, April 26th, 1930, viewed from 5th Ave. sidewalk bridge, 106th division and band. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
91 |
492 |
S-17, Police Parade, April 26th, 1930, viewed from 5th Ave. sidewalk bridge, aeroplane squad. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
92 |
493 |
S-35, Goodyear blimp cruising over Grand Central zone. 2 ¾ x 4 ⅝ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
92 |
494 |
S-28, 5/9/30, Navy planes flying over Broadway. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
92 |
495 |
S-36, [Goodyear blimp cruising over Grand Central zone]. 4 ⅝ x 2 ¾ in. |
undated |
|
|
|
Page |
Image |
Title |
Date |
92 |
496 |
S-34, 6/19/30, Rear Admiral Byrd back from the Antarctic, turning corner at 5th Ave. and 34th St. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
92 |
497 |
S-29, 5/9/30, "Los Angeles" dirigible and navy blimp visiting fleet in North River. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
93 |
498 |
S-26, 4/5/30, Fifth Ave. North of 33rd St. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
93 |
499 |
No. 417, 1/7/31, Night views from Empire State Bldg., looking North. 4 ⅝ x 2 ¾ in. |
1931 |
|
|
|
Page |
Image |
Title |
Date |
93 |
500 |
S-39, 7/30/30, 5th Ave. being repaved. 4 ⅝ x 2 ¾ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
93 |
NA |
No. 416, 1/7/31. 2 ¾ x 4 ⅝ in. [Photograph missing] |
1931 |
Page |
Image |
Title |
Date |
94 |
501 |
No. 418, 1/7/31, Night view towards Chrysler from Empire State Bldg. 2 ¾ x 4 ⅝ in. |
1931 |
|
|
|
Page |
Image |
Title |
Date |
94 |
502 |
S-38, 7/8/30, Skyline S.E. of building, New York Life and Metropolitan Life Bldgs. 2 ¾ x 4 ⅝ in. |
1930 |
|
|
|
Page |
Image |
Title |
Date |
94 |
503 |
S-37, 6/25/30, Skyline of Grand Central zone. New Salmon Tower--Lefcourt National--Grand Central Bldg.--10 East 40th St.,
Lincoln--Lefcourt Tower--Chrysler--Chamin--N.Y. News. 2 ¾ x 4 ⅝ in.
|
1930 |
|
|
|
Page |
Image |
Title |
Date |
|
506 |
17836, G.E. White-conduit installation, Empire State Building, New York City. E343.3, 8/12/30. 10 ½ x 8 in. [loose item]
|
1930 |
Page |
Image |
Title |
Date |
|
507 |
417837, G.E. White-conduit installation, Empire State Building, New York City. E343.3, 8/12/30. 10 ½ x 8 in. [loose item]
|
1930 |
Page |
Image |
Title |
Date |
|
508 |
417838, G.E. White-conduit installation, Empire State Building, New York City. E343.3, 8/12/30.10 ½ x 8 in. [loose item] |
1930 |
Page |
Image |
Title |
Date |
|
509 |
417842, Fibre under floor duct installation (Orangeburg system), Empire State Building, New York City. E343.3, 8-12-30. 10
½ x 8 in. [loose item]
|
undated |
|