Bankers Trust Annex Construction Photographs 1931-33
Photo #135
Photograph courtesy The Skyscraper Museum
 

Mechanical equipment was installed on several floors to ensure an adequate supply of fresh, properly tempered air. The size of the equipment used could be optimized by placing it on several floors throughout the building; several smaller units were more efficient at distributing tempered air than one or two large units in the basement and on the roof.