|
|
|
||||
In the five
days since the previous photo (B16280) was taken, the roof and masonry
gable of the Stevens Building along Wall Street have been removed. The
exterior stone cladding has been removed from another story of the Gillender
Building. The group of men at the right stand adjacent to one of the holes
in the protective staging that was used to drop debris into trucks waiting
on Nassau Street.
|